We had been wondering where the paving was going to take place ever since we found a tag on our door informing us of the dates of work. I had been hoping it was for the traffic circle and chicanes right about where you are standing in the second photo. They were laid out recently in spray paint.
So, any chance that anyone who is around the 'hood during the day could talk them into fixing some of the other glaring pavement problems -- particularly 23rd Avenue? :-) The pavement is in terrible condition in multiple places from Yesler Way down to Interlaken (23rd and 24th Aves both). I have filed multiple SDOT requests on these (and some James St) issues. Anybody else been seconding these by chance?
Good luck with 23rd - my understanding from SDOT is that really fixing 23rd is going to require a lot more than just patching potholes. It's on the longer-range plan, under consideration for a road diet - there should be some public meeting process before too much longer I suspect.
Help: Comments
The main text of your comment goes here.
Basic html tags such as a, b, i, strike, and blockquote are allowed